Solution
GI Land provides WMS with flexible APl
Warehouse Management System
Gl Land WMS team has a deep insight in the manufacturing industry, especially for the garment industry

System

Management


• Role Definition

• User Definition

• User Role Assignment

• Maintenance of User Administration Access

Basic Information

Management


• Material Category Management

• Material Master Data Management

• Supplier Master Data

• Customer Master Data

• Departmental Master Data

• Basic coding Maintenance

Inbound

Management


• Input Inbound Plan

• Import Inbound Plan

• Material Bar Code Printing

• Listing

• Empty Pallets (bins) Received on Shelves

Outbound

Management


• Input outbound Plan

• Import outbound Plan

• Delist

• Piece Select

• Remaining Materials Returned to the Warehouse

• Empty Pallets/Bins   Retrieved from Shelves



Inventory

Management


• Storage Location Display

• Inventory Maintenance

• Inventory Warning


System Query


• Inventory Query

• Inbound and Outbound Records Query

• Inbound and Outbound Plans Query

Outbound Principle


• FIFO, Set by Priority



Inbound Principle


• Material Store in Multiple aisles,

Storage Locations Allocated nearby

and downside first


External System Interface

• Basic Data Interface

• Business Document Interface


Other Functions


• To-do List

• Task Management


Software—Central Control System
GI land Central Control Scheduling System provides an overall solution for the scheduling and collaborative work of multiple types of equipment in complex intelligent scenarios.
This system is capable of seamlessly integrating and managing a diverse range of utilities and equipment from different manufacturers, including AGVs, stackers, elevators, shuttles, lifting doors, robotic arms, intelligent forklifts, and case-handling AGVs. All these are coordinated by an overarching algorithm and scheduling mechanism to cater to diverse operational demands. It excels at executing intelligent tasks within specified time frames, even in intricate scenarios.
The main functions of CCS include policy configuration, task templates, dispatch center, route planning, global model, scenario monitoring, abnormal alarm, statistical analysis, etc.
Software—Smart Engineering Design
3D Panoramic Monitoring Visualization System










3D Panoramic Monitoring Visualization System:

• Employs intelligent logistics equipment monitoring and advanced visual management. • Provides visual oversight of equipment operation data. • Facilitates real-time tracking of inventory dynamics and visual inventory management. • Allows for immediate queries on storage location changes with visual management. • Ensures material traceability and path visualization. • Delivers a panoramic view of system operations through visual management.